by theveridusgroup | Feb 1, 2024
by theveridusgroup | Feb 1, 2024
Located on three separate school campuses, Avon Schools looked to build building additions, walkways and parking improvements to their facilities. Veridus Group’s work on this large-scale and intricate project has helped Avon Schools work toward their future planning...
by theveridusgroup | Feb 1, 2024
The Veridus Group was hired by HIS Constructors to prepare and design the site work for a 16.65 acre site located in Fairland, IN. The flat terrain and initial cost controls limited the site, however with the Veridus Group team and continuous collaboration with the...
by theveridusgroup | Feb 1, 2024
As Greenfield Central Schools were looking to expand, the Veridus Group Civil Engineering Team designed three separate building additions that would serve the High School and Middle School campuses. The Veridus Group’s experience in layout and site challenges with...
by theveridusgroup | Feb 1, 2024
Located along Epler Avenue in Indianapolis, this project required our Civil Engineering expertise and experience in ROW construction. Providing construction documents that included survey, grading and erosion control within a unique design, the Veridus team improved...
Recent Comments