The Veridus Group’s experience in school campus design served well when Brownsburg High School campus needed to realign the Mary E Wilson Legal Drain. The analysis of the surrounding watersheds and redesign of storm structures to reroute the drain through the campus was a challenge the Civil Engineering Team mastered. Despite these ecological challenges, the Brownsburg High School will be better suited for any future expansion or additions to its campus.
Brownsburg Schools
Civil / Site Engineering![Brownsburg High School The Veridus Group](https://theveridusgroup.com/wp-content/uploads/2020/12/Brownsburg-HS2.jpg)
Recent Comments